Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяCandidate
Male, 37 years, born on 28 August 1987
India, willing to relocate (Belarus, Georgia, Moscow, Russia, Saint Petersburg, Ukraine), prepared for business trips
Civil Engineer (SPECIALIST CIVIL & ELECTRICAL)
90 000 ₽ in hand
Specializations:
- Other
Employment: full time
Work schedule: full day, shift schedule, flexible schedule, remote working, rotation based work
Work experience 14 years 5 months
May 2016 — currently
9 years 1 month
HLK Group
India, www.hlkgroup.in
Civil Enginer (Specialist Civil & Electrical)
Project Management
BOQ Preperation.
Estimation, Costing of complete project.
Quantity Surveying.
Billing.
Project Planning.
Pre & Post execution snagging with remedies to control project cost.
Auto cad, Google Sketchup use for quantity calculation.
Rate analysis.
Material analysis.
Supervise Progress work, Prepare Daily-weekly-monthly progress report with planned vs achieved report for higher authorities & Project manager.
• Quantity surveying & rate analysis for the material selection which looks beautiful after construction and lower in cost.
• Coordinate with Architect, Structural constant, MEP Services design team or consultant and subcontractors to achieve planned goal with in stipulated time.
• Prepare Snag Report after execution with best remedial solution - make debits on concern sub-contractor who execute the work.
• Prepare delay analysis, repeat planning for the whole remaining work as per hinderance with solution to achieve progress goals.
• Calculate Volume of work & material to raise requisition of material.
• Manage quality assurance & safety as per company norms.
• Finalise & negotiate of new work items rates with subcontractor for allowing extra items.
• Financial, Material, Payments and work reconciliation on monthly basis highlight area of over estimation which is debited to concern sub-contractor. Mention implements, If require.
• Complete project - man power report, Tools & Machine (equipments) report to ensure the project will finished in stipulated time. (with duly signed documentation.)
• Pre-supervision of work — Communicate with subcontractor for method and strategies of work with in the permissible time limit. To ensure the achievements of work to reduce construction cost and save from construction delay penalty. Check work progress every evening to endure work progress is going as per planned. If planning is failed — Intimation letter will gave to contractor and re-plan the same. and took followup of work progress day to day. (with duly signed documentation.)
• Pre and post construction supervision and signed the necessary documents, if required.
• Strong required software knowledge. Good speed to work on Mac os & all widows operating system.
• Checking of supplier (or sub-contractor) material with technical specification, Quality of material, Technical documents. (for example — MDTC or MTC etc)
October 2015 — April 2016
7 months
Skyline Builders (INDIA)
Project Engineer Specialist
Contractual Job for 5 star Hotel
- Quantity Surveying & billing.
- Good knowledge in Laminate floorings and wood work.
- Daily, weekly & monthly progress report for managing directors and chairman.
- coordinate with project manager for hampering issue and some other to boost up progress of the project.
- prepare bill of quantity.
- prepare rates of bill for different new items.
- knowledge of construction technology and methods of quality control.
- prepare monthly snag supervision reports after construction with solution to reduce. Mark debits on contactors.
- involving construction execution.
-material quality assurance.
- pre and post construction quality check to save construction cost.
- Preplanning to achieve goals with in permissible time limits.
If you want know in details, will ask at the time of interview.
April 2013 — September 2015
2 years 6 months
Teks Tech Inspection India Private Limited
India, www.tekstech.com
Construction, Real Estate, Architecture... Show more
Civil Engineer (For multi tasks)
- Quantity Surveying & billing.
- Good knowledge in Laminate floorings and wood work.
- Daily, weekly & monthly progress report for managing directors and chairman.
- coordinate with project manager for hampering issue and some other to boost up progress of the project.
- prepare bill of quantity.
- prepare rates of bill for different new items.
- knowledge of construction technology and methods of quality control.
- prepare monthly snag supervision reports after construction with solution to reduce. Mark debits on contactors.
- involving construction execution.
-material quality assurance.
- pre and post construction quality check to save construction cost.
- Preplanning to achieve goals with in permissible time limits.
If you want know in details, will ask at the time of interview.
January 2011 — March 2013
2 years 3 months
Mellcon Engineers Private Limited
India, www.mellcon.com
Industrial Equipment, Machine Tools and Components... Show more
Site Civil Engineer
- coordinate with project engineer for fail progress.
- coordinate with contractors and foreman for daily progress and planing for further work.
- coordinate with structural engineer, architect and mep services.
- draw some drawing for external services, stp, etp plants etc.
- heavy duty trimix construction under my supervision.
- prepare daily, weekly and monthly progress report.
- raw material price negotiating and submit to purchase department.
- set up petty work contactor by selecting less price and enough experience.
Skills
Skill proficiency levels
About me
Experience Summary —
• Project management: project control, Complete monitoring on project daily activities (Issue or hamper things solution on immediate basis). Prepare daily/weekly/monthly project progress report, Planning and risk analysis submit to the Chief of project or company.
• Supervise Progress work, Prepare Daily-weekly-monthly progress report with planned vs achieved report for higher authorities & Project manager. Estimation of all project execution from site engineer, Material supplier and material store, Structural Engineer, Contractors & Sub-contractors.
• Construction Execution Planning analysis and daily followups. So that Estimated project cost will not increase due to delay or some other risk. Develop cashflow projection.
• Quantity surveying & rate analysis for the material selection which looks beautiful after construction and lower in cost. Enrol new construction technologies which will reduce the cost of construction, Change order in case of increase of work or increase of market rate from the Current BOQ and letter of award.
• Coordinate with Architect, Structural constant, MEP Services design team or consultant and subcontractors to achieve planned goal with in stipulated time. Contractor payment analysis, Material inventory, contractors inventory to ensure that project is going on planned cost estimation.
• Prepare Snag Report after execution with best remedial solution - make debits on concern sub-contractor who execute the work. Debits shall be made in case of any delay or quality issue.
• Prepare delay analysis, repeat planning for the whole remaining work as per hinderance with solution to achieve progress goals.
• Calculate Volume of work & material to raise requisition of material.
• Manage quality assurance & safety as per company norms.
• Finalise & negotiate of new work items rates with subcontractor for allowing extra items.
• Financial, Material, Payments and work reconciliation on monthly basis highlight area of over estimation which is debited to concern sub-contractor. Mention implements, If require.
• Strong required software knowledge. Good speed to work on Mac os & all widows operating system.
Higher education
2011
Shivalik Group
Civil Engineering, CIVIL ENGINEERING
Languages
Citizenship, travel time to work
Citizenship: India
Permission to work: Russia
Desired travel time to work: Up to one hour