Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online more than two weeks ago
Candidate
Male
India, I want to relocate, prepared for business trips
Quantity surveying and cost Professional
6 000 $ in hand
Specializations:
- Sales manager, account manager
Employment: full time, project work, work placement
Work schedule: full day, shift schedule, flexible schedule, remote working, rotation based work
Work experience 12 years 7 months
May 2017 — June 2019
2 years 2 months
FIR-CROFT
Kazakhstan, www.linkedin.com/in/ashok-kumar-medisetty-98716441
QUANTITY SURVEYOR
CHANGE MANAGEMENT, COST, AND BUDGETING, RE-MEASUREMENT, IPA's, ASSIST AND COORDINATE WITH CONTRACTS, PLANNING AND PROCUREMENT TEAM, QUANTITY TAKEOFF AND COST ESTIMATION OF CIVIL, STRUCTURAL, MECHANICAL, AND PIPING WORKS, FINAL ACCOUNTS.
November 2014 — October 2016
2 years
Saipem S.p.A.
Anapa
Quantity Surveyor
• Create and update the project bill of quantities in the form of a quantity record booklet according to active and passive invoicing procedures.
• Update the project management database with actual data
• Verify the actual quantities in order to assess both the active and the passive progress measurement according with the contracts in place.
• Supply quantitative data for the preparation of Extra Works and Dayworks
• Ensure the monitoring of daily man hours/equipment spent by construction contractors or in direct hiring
• Monitor the actual quantities in order to assess both the active and the passive progress measurement according with the contracts in place.
• Verify the correct implementation and use of the project management information systems for the project (also for subcontractors)
• Verify the correct implementation of quantities data for extra works and dayworks and provides assistance to carry on the new prices analysis.
• Verify data consistency in respect to company procedures and project agreements
• Assist the Mgmt Syst.and Quantity Manager for the creation of the necessary reports
• Verify the monitoring of daily man hours/equipment spent by construction contractors or in direct hiring
• Assist in the technical-administrative settling of claims presented by sub-contractors
• Ensure the set-up, the training and the implementation for the Project of the Mechanical Information Systems for the piping spooling, for the complete management of the welding data production till the hydro test completion phase and the proper traceability of spools/fabricated material during Construction Works
July 2011 — October 2014
3 years 4 months
La’ala Al-Kuwait Construction Company, Al-Khiran, Kuwait
Kuwait
Construction Engineer
• Responsible for site supervision works, planning, conducting and coordinating with the technical and management aspects of projects
• Maintain project safety awareness and enforce company safety policy.
• Monitor contractor Quality Control Program. Facilitate coordination of contractor’s work with third parties, i.e., utility agencies or other public agencies.
• Review and respond to contractor’s technical queries and coordinate with Engineering Department on technical issues
• Coordinate and liaise with clients, consultants and sub-contractors on daily operations.
• Monitor and ensure projects are in progress for timely completion
• Prepare and consolidate progress reports, method statement
• Ensure safety compliance are properly implemented to control risk
• Oversee the implementation of construction works and
• Be responsible for coordinating and Supervising subcontractors’ works.
• Supervise quantity reporting. Prepare daily reports on each contractor.
• Ensure timely completion and Quality standards of project
• Review contract tor’s monthly invoices. Review O&M manuals, monitor as builts. Evaluate construction material testing results.
• Participate in final inspection and prepare punch lists. Review engineering design packages for constructability issues and lessons learned.
• Prepare and update all site reports and monitor progress of project.
• Knowledge and understanding of the General Contract, each Subcontract, the contract drawings, specifications and addenda, and to assist the Project Manager in the development of the on-site procedures.
• To assist the Project Manager and the Scheduling Manager in the development and refinement of the Project Schedule, and to work with the Project Manager to keep the schedules properly updated, and to see that the job meets the various required dates.
• To plan and review the Construction Program with the Project Manager including quality control procedures, safety and security practices, field office location and layout, temporary utilities, staging areas, equipment and manpower.
• To coordinate, direct, monitor, and with the Assistant Superintendent(s) and the technical coordinators, (project specific as required) inspect the activities of the Subcontractors, Suppliers, labor and material.
• Estimation
• Sub-contractor running bills
January 2010 — March 2011
1 year 3 months
Punjlloyd Company Ltd , Tripoli-Libya.
Libya
Quantity Surveyor
• BOQ preparation
• Abstracting quantities from drawings and soft copies
• Preparing specifications & Bills of quantities
• Estimating
• Analyzing rates
• Taking site measurements,
• Preparing monthly bills
• Variations
• Verification of contractor's running & final bills as per contract condition.
• Budgeting and Monitoring for a project
June 2002 — March 2006
3 years 10 months
Nagarjuna Construction Company LTD,India
India
Site Engineer
• Quality Inspections(witness & sign-off in accordance with approved method of statements, ITP’s, Checklists, Dwgs, specifications etc,)
• Submitting Inspection request’s and RFT’s
• Development and manage of Logs and maintain complete QA documentation
• QA checks, Materials delivered, Material Installed, etc.
• To assist the Package Manager in executing duties to deliver the works safely, efficiently and a high quality
• Typically undertake and coordinate quality monitoring and hold point sign-off, record productivities of the executed works, monitor safety, quality and efficiency as directed by Package Manager.
• Typically be directly responsible for day to day activities of contractors.
• Prepare weekly progress reports and maintain request for information (RFI) records
• Attending weekly Progress & Quality control meetings with contractors, consultants and Managers.
• ensure works delivered safely, to a high quality, within cost and on time.
• nspects construction site to monitor progress and ensure conformance to engineering plans, specifications, and construction and safety standards.
• Ensuring all materials used and work performed are as per specifications. • Partake in, and occasionally lead, the weekly safety toolbox meetings.
Skills
Skill proficiency levels
About me
I’m a highly successful Multi-Discipline Quantity Surveying and Cost Estimation Professional with International experience in multi-disciplinary complex works within the Oil and Gas, LNG Plants, Sewage Treatment Plants, and Infrastructure projects with core expertise in Quantity surveying and Cost Engineering (including Pre and Post Contract) as a part of a busy team effectively managing all the costs relating to the project.
Gained experience as a Quantity Surveyor with in depth knowledge on Bill of Quantities, Change Management, Quantity takeoff and Cost Estimation of Civil, Structural, Industrial, Mechanical & Piping works, Sub-Contracts, Claims, Re-measurement, Cost and budgeting, tender review including procurement. Fully conversant of RICS method of measurements, Lump Sum Turnkey, Cost Plus, EPC, and Reimbursable Contracts.
Specialties: Quantity surveying and Cost Estimation including Pre and Post Contract.
Areas of Expertise
1. Quantity Surveying
2. Cost Estimation, Cost Reporting, and Cost Planning
3. Change Management
4. Procurement Strategy
5. Budgeting
6. Re-Measurement
7. Sub-Contracts
8. Claims and Variations
KEY PROJECTS
1. Onshore - LNG Plants and Oil & Gas Projects
2. Under Ground Utilities (Sewer, Storm, Potable, Irrigation, HV & LV Lines)
3. Overhead Transmission Lines
4. Sub-Stations (HV and LV)
5. Sewage Treatment Plants ( 339 MLD, 30 MLD, and 15 MLD) including UASB Reactors.
6. Pump Stations
7. Infrastructure Works ( Roads, Bridges, Culverts, and Buildings )
Higher education (bachelor)
2009
Jawaharlal Nehru Technological University
Civil, Civil Engineering
2002
State Board of Technical Education and Training
Civil, Diploma In Civil Engineering
Languages
Citizenship, travel time to work
Citizenship: India
Permission to work: Kazakhstan
Desired travel time to work: Doesn't matter