Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online more than two weeks ago

Candidate

Male, 54 years, born on 1 June 1970

India, not willing to relocate, not prepared for business trips

E&I Superintendent

10 000 $ in hand

Specializations:
  • Other

Employment: full time

Work schedule: full day, rotation based work

Work experience 16 years

April 2018currently
7 years 2 months
TECNIMONT

Russia

Projects manager
stations (Electrical Mechanical(Piping) and Instrumentation works). MOV, VFD Controls , Compressor stations, MCCs, Transformers , generators , Flow meters , Water Analyzers , chlorination system etc FOC cable for access control system ,CCTV, telecom and also for HV feeders 6 No's of big reservoir tanks, Pumping station DI pipes & fittings , HVAC & Ventilation system , SCADA , Pump skids , valves , field instruments
April 2018currently
7 years 2 months
TECNIMONT RUSSIA

Russia

E&I MANAGER
OIL AND GAS
January 2014currently
11 years 5 months
IMCO ENGINEERING & CONSTRUCTION COMPANY
CONSTRUCTIION MANAGER
Presently working with IMCO EPIC Company as E&I Manager in QATAR for QATAR Petroleum projects and MEP projects. I can join on immediate basis. CS PIPE LINE EXP: 15 YEARS (56, 48, 36, 24 INCHES) NOC or release available from my present company Worked in the following Location (26 years of experience, oil and gas expr 22 years) Worked in Middle East, Iraq, Russia and CIS countries. QATAR & International Driving License holder BOSIET(OPITO APPROVED OFFSHORE CERTIFICATE AVIABLE WITH ME) Total years of work Experience:-26 years (Worked in IRAQ for Booster compression station with SHELL Project in BASARA) CS PIPE LINE EXP: 15 YEARS (56, 48, 36, 24 INCHES) GAS TURBINE EXP: 09 YEARS MEP EXP: 14 YEARS OFFSHORE EXP; 4 YEARS ONSHORE EXP: 17 YEARS OIL AND GAS EXP: 21 YEARS O&M EXP (OIL&GAS):12 YEARS CATODIC PROTECTION EXP: 17 YEARS GAS TURBINE EXP: 09 YEARS SHUTDOWN EXP: 09 YEARS No. of years in Oil and Gas Sector:-21 years Gulf/Middle east Exp: 18 years Notice Period:-Immediate (Ready available) Nationality / Dual Nationality:-INDIAN Current Location:-QATAR Date of Birth:- 01-June-1970 Best Phone No:-00974-70489154(QATAR), 0091-9912767633(INDIA) Availability:-yes. Highlights of my Experience: 1) Worked up to 56 inches CS pipe line in Turkmenistan with (PETROFAC) From CPF to Compressor station (105 KM lengths) total Mechanical works, E&I, Cathodic protection and Fiber optical cable, 11 KV overhead lines with steel towers and SBV(4 No’s, PIG launcher and Receiver and three TIE in joints) and 180 meter length HDD(River crossing) 32 No’s Gas wells and 4 no’s Gas treatment Units with around 120 KM CS (4” to 24”) trunk & Flow lines (Including field engineering and construction , installation and commissioning the plant) 2) Worked up to 24 inches Pipe line (210 KM length) with QATAR PETROLEUM in QATAR including all Mechanical, E&I, Cathodic Protection and FOC with 11 KV electrical lines. 8 No’s MLV and 5 no’s TIE in joints.(15 no’s Road crossing with 30inches CS casing). 36 Inches 65 Km pipe line and 24 inches Fuel Hydrant system for Hamad International Airport (QATAR) total Mechanical works, E&I, Cathodic protection and Fiber optical cable . 3) Worked up to 24 inches pipe line with 3 No’s GE gas turbines for compressor stations with SHELL Project in IRAQ in BASRA. Total Mechanical works, E&I, Cathodic protection and Fiber optical cable. 4) Worked up to 48 inches pipe line (250 KM length) 3 No’s GE gas turbines for compressor stations in INDIA for Reliance Industries with 8 No’s MLV stations. Total Mechanical works, E&I, Cathodic protection and Fiber optical cable, 5) Worked with 250 No’s oil well heads with 6 inches to 12 inches pipe line works upto CPF plants and 24 inches pipe line up to filling platform in Yemen.
February 2014April 2014
3 months
IRAQ CONSULTANCY AND CONSTRUCTION COMPANY
Construction Manager
with INLET Booster Compressor station (SHELL PROJECT) Project Value: 1.2 Billion USD Location: IRAQ(SHELL PROJECT): Worked as Construction Manager for the Inlet Booster compressor station with 3 No's PGT Gas Turbine Compressor with all CS Pipe line,E&I ,HT Voltages ,SCADA,F&G,Cathodic Protection and telecom, works. Main pipe line welding works and trunk & flow lines installations of all E&I cable and FOC laying, glanding , termination and loop checks and commissioning. Cathodic protection works(TCP & PCP).Installation of Remote Terminal Units(RTU& SCADA) to monitor and to operate the well heads and numerous substations up to69Kv/13.8Kv/480v, panels, cables (HV, MV, LV),. 2) PETRO MASILA (Ministry of oil and gas Exploration, YEMEN)
March 2013February 2014
1 year
YEMEN Ministry of OIL AND GAS EXPLORATION
superintendent
with YEMEN Ministry of OIL AND GAS EXPLORATION, as Construction IN charge Eng. & Construction dept.(Shutdown Projects) (Onshore Project): Worked as Construction charge for onshore project oil exploration for the conduction of petroleum operations under a Production Sharing Agreement (PSA) with CANADIAN NEXEN. All Mechanical & pipe line works, Electrical, Instrumentation, telecommunications and cathodic protection, Engineering, Construction, Installation & commissioning and Maintenance of exiting CPF plant and construction works for 60 no's New Oil well heads and 8 no's treatment unit plants(Gathering units)and 32 no's tie in joints with exiting flow pipe lines. Installation of Variable speed drives (VSD) and Electrical submersible Motors with pumps (ESP) and step up transformers to feed the high voltage electrical submersible pumps. All E&I cable laying, glanding , termination and loop checks and commissioning. Cathodic protection works(TCP & PCP).Installation of Remote Terminal Units(RTU& SCADA) to monitor and to operate the well heads and numerous substations up to69Kv/13.8Kv/480v, panels, cables (HV,
January 2012March 2013
1 year 3 months
PETROFAC INTERNATIONAL LTD
Construction SUPERINTENDENT
3) PETROFAC INTERNATIONAL LTD ( with PETROFAC as Construction SUPERINTENDENT (ONSHORE Gas Field Development project) Client: Turkmen gas Location: Yoloten, Turkmenistan (On Shore Project) Project Value: 3.8 Billion USD World's second largest plant with Engineering, Procurement, Supply, Construction and Commissioning for the South Yoloten Gas Field Development Project in Turkmenistan. All Mechanical, Electrical, Instrumentation, FOC cable laying ,telecommunications and cathodic protection, Engineering, Construction, Installation & commissioning (Comprises the development consists of 32 Gas wellheads and associated flow lines to four remote Gas Treatment Units (GTUs), infield condensate/water pipelines from GTUs to CPF-1, infield dry gas pipelines from GTUs to CPF-1, a main Central Processing Facility (CPF-1) and 56'' gas export pipeline with 6 SBV's to Existing Shatlyk compression station. CPF-1 consists of two parallel gas trains (2 x 5 BCMA), power generation (GTG 126MW), condensate storage, sulphur handling, sulphur export and utilities, with permanent Cathodic protection system and substations switch yards up to 220Kv/35Kv/10Kv/440v, panels, cables (HV, MV, LV), 4) PUNJ LLOYD (Oil & Gas) - 3 Years
June 2009January 2012
2 years 8 months
PUNJ LLOYD
Construction Manager
Client: Qatar Petroleum Location: Qatar

About me

Substations, construction implementation, Manage the construction implementation, construction Planning, Cathodic Protection, Installation and Commissioning, Flowlines, Maintenance, High Voltage, Oil & Gas Exploration, Power Generation, Welding, sulphur handling, Carbon steel, Contract Management, Electrical Engineering, Employee Engagement, Gas Turbines, Manage the E, Manage the QA Procedure, Manage the turnover, Oil Terminals, Power Stations, Project Management, Project Planning, Project Team Skills, Quality Control, Quality system implementation, Resource Planning, Responsible for shutdown, Responsible for the erection, Site Management, Team Management, cable design, close coordination, deliverable management, equipment design, interface management, power testing, scope planning, CCTV, SCADA, Computerized Physical Fit, Digital Cross-Connect, NOC, Programmable Logic Controller

Higher education

1991
INDIA
ELECTRICAL, ELECTRICAL

Languages

EnglishNative


Citizenship, travel time to work

Citizenship: India

Permission to work: Azerbaijan, Kazakhstan, Russia

Desired travel time to work: Up to 90 minutes