MedSteel S.A.
Metallurgy, Metalwork... Show more
Project Manager
Concept to commission a steel plant (Green Field Project) with 1 Million Ton/annum production capacity
Procured capital equipment such as:
o Main Sub-station (230KV/20KV/6.6 KV GIS) from ABB, Sub-station Communication System, Electric Power from utility provider, Sanction Power 124 MVA, 230KV, 50Hz
o 125MW Diesel Power Plant, Electric Arc Furnace, LF & Alloy Addition System from Siemens VAI, 4 strands 8 meters radius high speed CCM from Siemens Pominio120L/110C Static Var Compensation (SVC) from Egesim ,Turkey. Water Treatment Plant & Dedusting Plant from Perteco, Italy
o MV, LV Cables and Cable Trays
Completed engineering, installation of EAF, LF, CCM, Dedsusting & water treatment plant. Engineering & installation of cables, cable trays, switchgears, earthing system, lighting, lightning and Fire Alarm
Conducted basic & detail engineering for Distribution Transformers & Switchgears of 4nos. substations, cables routes, cable trays and cables
Gained knowledge of Hot Dip Galvanizing process on MS & HT galvanized structural steel
Engineering & execution of the plant underground cable tunnels routes/ sizes/ levels & auxiliary power supply 20 MW (230/6.6/0.4KV) for the total project
Led the erection of 230/20/6.6 KV, 50 Hz, (124MVA sanctioned load) GIS substation from basic engineering (includes civil drawings approval) to commissioning at Syria
Done basic engineering for civil work and its Distribution Transformers Room, MCCs, Control Buildings
Operated main sub-station 230/20/6.6KV (GIS) equipment (SA, CVT, Isolator, CT, SF6 CB, Isolator, Bus bars, Isolator, SF6 CB, CT, SA, REL 670, RED 670, 75/106 MVA, 230/20KV, 50 Hz transformer, 25 MVA 230/6, 6KV, Earthing Transformers & 120L/110C, protection panels, CTR fire prevention & extinguishing, DC battery charger and so on
Led the completion of SVC civil work, installation of Steel structure equipment, distribution transformers and its switchgears, cable connections
Also done engineering, procurement, erection and commissioning of Heating, Ventilation, Air Conditioning, Fire alarm system, Grounding/ Earthing, etc.
It is a grenfield project of steel production ( Billets), I was reporting to CEO, and I worked as Project Head (Engineering, CapEx, Projects, Procurement, Project Management), My work force was 37 employees.